How the Concrete Calculator works
Calculate rectangular concrete volume.
Before using the result
This is a planning estimate. Confirm dimensions, allowances, material specifications, applicable codes, and supplier requirements before purchasing or construction.
For a slab, path, footing or pad with straight sides, the volume of concrete is simply length × width × depth:
Volume (m³) = length (m) × width (m) × depth (m)
Every input is in metres, and that includes the depth. A 100 mm slab is 0.1 m, and a 75 mm path is 0.075 m. Entering "100" for depth is the most common mistake on this calculator, and it makes the answer 1,000 times too big.
Worked example: a 6 m × 4 m shed slab
Length 6 m, width 4 m, depth 100 mm = 0.1 m
6 × 4 × 0.1 = 2.4 m³
Add a waste allowance of about 5–10% for uneven sub-grade, formwork bulging and what stays in the barrow: 2.4 × 1.08 ≈ 2.6 m³
I would order 2.6 m³. Running short halfway through a pour leaves a cold joint, which is far worse than paying for a little extra. Most suppliers deliver in 0.2 m³ steps and charge a short-load fee under a minimum (often 3 m³), so it's worth asking about that when you book.
Ready-mix truck or bags?
As a rough guide, a 20 kg bag of premix makes about 0.01 m³ once mixed, so you need roughly 100–110 bags per cubic metre. Check the yield printed on your brand. Beyond about 0.5 m³, bags become hard work and a small truck or a mini-mix delivery usually makes more sense.
Choosing the depth
Garden paths and light shed slabs are often 75–100 mm.
Driveways for cars are commonly 100–125 mm with reinforcing mesh.
House slabs, footings and anything structural should be designed by an engineer to your local standard (in Australia, AS 2870 for residential slabs and footings). Don't size those from a calculator.
Other shapes
Break an irregular area into rectangles, work out each one, and add them together. For round columns or piers, use volume = π × radius² × height. Our round column concrete calculator does that for you. For a strip footing, use the trench length × width × depth.
Common mistakes
Entering depth in millimetres instead of metres.
Measuring to the outside of the formwork when the boxing is set inside the area, or the other way round.
Forgetting thickenings: edge beams and internal beams under a slab can add a lot of volume.
Not allowing for a sub-grade that dips below the design level.
Frequently asked questions
How many cubic metres of concrete do I need for a 10 m² slab?
At 100 mm thick it is 10 × 0.1 = 1.0 m³, so order about 1.1 m³ with waste.
How do I convert cubic metres to cubic yards?
Multiply by 1.308. For example, 2.4 m³ ≈ 3.14 yd³.
Does reinforcement reduce the concrete volume?
Not in any way that matters. Steel mesh or bar takes up well under 1–2% of the volume, so ignore it for ordering.